Claim C1.2.2.3.3.4.1 The safety operating envelope has been identified and implemented
[Back to main map]
Parent nodes:
Is a subclaim of
Claim
:
C1.2.2.3.3.4 The risks from 'nuclear' hazards during operation of the robot are managed and ALARP
Child nodes:
Has support
Argument
:
A1.2.2.3.3.4.1.2 The Safe Operating Envelope is provided by compliance with Conditions for Acceptance (CFA) for the pond and compliance with procedural and equipment designations
Has support
Argument
:
A1.2.2.3.3.4.1.4 A set of operations have been identified the <robot's task>. These operations will be addressed by this safety case.
Has support
Argument
:
A1.2.2.3.3.4.1.3 The boundaries for achieving the tasks addressed in this safety case have been identified.
Has support
Argument
:
A1.2.2.3.3.4.1.1 The environment has been prepared for the task as per the Conditions for Acceptance analysis and signed off